Process Control Integration - INS 233 at Lord Fairfax Community College
Showing: WWW Online - WWW Online w/E-Rate
Distance Learning
Showing: WWW Online - WWW Online w/E-Rate
Showing: WWW Online - WWW Online w/E-Rate
Time of Day
Term
- INS 233 - Process Control Integration
- Presents computer automation including PLCs, SCADA, and PC-based systems to control processes. Topics such as PLC control and computer data acquisition are introduced where students will use existing systems or build systems and control these systems with PLCs and computer data acquisition systems. Assesses students through test and project evaluations and the course will be assessed by graduate feedback. Prerequisite: INS 230, and ELE 233.Lecture 2-3 hours. Laboratory 3-4 hours. Total 5-7 hours per week.
Prerequisites: INS 230 and ELE 2333-4 credits
Schedule at Lord Fairfax Community College
Not scheduled at this time